Reduced iron charging unit successfully put into operation in Kunming Iron and Steel
August 28, 2009, The patented technology - "reduced iron integrated charging unit" designed by our company in Kunming Iron and Steel reduced iron production line successfully put into operation, after production data show that: the station every 10 minutes to be completed loading, the class can charge 42-48 cars, the unit has the capacity of an annual output of 200,000 tons DRI. The picture is general manager Wang shouping, deputy general manager Wang Lixin, in charge the unit into operation.